Cold air.Hot compute.
A modular data center high in the mountains.
Cooled by nature. Built for the heaviest AI workloads.
Scroll to explore
Raw power.
Real results.
24,000 GPUs working as one system.
Here's what that power turns into.
- GPUS
- 24,000
- POWER
- 45 MW
- UPTIME
- 99.99%
Everything
is connected.
Thousands of fiber strands carry data
between modules at the speed of light.
1,600 km of fiber
400 Gbps per link
Cluster 07/2,048 GPUs/Online
Ambient −12°C/Load 0%
Status online
One becomes many.
Modules link into clusters. Clusters link into a network that grows with your load.